FAQs
- Describe a recent project you are fond of. How long did it take?
Wiring of another shed. Installed about 80 ft of cable 10-3 AWG. Rated at 40 Amp for a shed and installed a sub panel is his work shop. Along with several outlets and switches.
Hired 2 times
Background checked
10 years in business
Ask this pro about their preferred payment method.
29 photos
, , , , ,
2 reviews
Hired on Thumbtack
Hired on Thumbtack
Royce Thomas
Wiring of another shed. Installed about 80 ft of cable 10-3 AWG. Rated at 40 Amp for a shed and installed a sub panel is his work shop. Along with several outlets and switches.