SwitchGrass Rebuild LLC
SwitchGrass Rebuild LLC

SwitchGrass Rebuild LLC

contact for price

Repair types
Sorry this pro can’t do your job, but we know other pros who can.
Introduction: Outstanding carpentry skills combined with art school background to create beautiful fences that last. We use deck screws and stainless steel fasteners for corrosion resistant connections. We connect our rails & beams to the posts with coated deck screws and use stainless steel nails & staples to fasten all our pickets to their support beams. This prevents staining of the pickets due to nail corrosion. Because of this we guarantee all our fasteners connections and hardware for two years. If the connections fail we will repair them at no cost to you. We set all our posts in concrete and we finish and slope the concrete slightly above grade to prevent moisture from pooling at the bottom of the posts. (A common cause of fence post failure is the inability of the post to dry properly where it meets grade.) We provide outstanding customer service and complete our projects on schedule. Our attention to details and concerns for producing an outstanding product are what drives us. We love the creativity required to build each project and the satisfaction provided to the client upon completion of each project.
Overview

Hired 56 times

11 years in business

Payment methods

Ask this pro about their preferred payment method.

Top Pro status

Top Pros are among the highest-rated, most popular professionals on Thumbtack.

Top Pro Icon

2018

Top Pro Icon

2017

Top Pro Icon

2016

Featured Projects

25 photos

FAQs

  • What is your typical process for working with a new customer?

    After initial contact, I'll have the client schedule an appointment for me to look at the property, discuss routing of the fence and then do an accurate measure of the fence. Once that is completed I can prepare an accurate estimate of the cost of the fence and the length of time it will take us to complete the fence. The estimate is emailed to the client within 3-4 days of the measure.

  • Loading