Fort Smith, AR6 Bathroom Remodeling Contractors near you

Where do you need the bathroom remodeling contractor?

Answer a few questions

Tell us what you need so we can bring you the right pros.

Get quotes

Receive quotes from pros who meet your needs.

Hire the right pro

Compare quotes, message pros, and hire when ready.

Fort Smith Bathroom Remodeling Contractors

Browse these bathroom remodeling contractors with great ratings from Thumbtack customers in Fort Smith.

Gomez & Falk Services LLC
4.7
from 18 reviews
  • 19 hires on Thumbtack
Nick J.
Verified review

I cannot overstate how pleased I was with the work done at my house by Leslie Alley & Falk Remodeling. Simply put, for my project things could not have gone better. I felt I was treated with the utmost respect and felt my business was greatly appreciated, which can be an anomaly these days. Leslie came out to my house over the course of 2 days and completed a tin roof extension over an existing patio in my back yard. Leslie kept me updated with his progress and kept me in the loop as to his process as he went along, frequently making sure I was happy with his workmanship. I look forward to years of great use with the added assurance that I can call if there are any issues found after the service. I've hired a number of different contractors over the years for various projects around the house and none hold a candle to the experience I had with Leslie. Highly recommended!!

  • 4 hires on Thumbtack
Gaylene W.
Verified review

We hired Brandon's company to replace some flooring in our bathroom because of water damage. The crew was always on time and very courteous. We also had him tile our shower. It looks great, he did an excellent job. We had some additional problems with the plumbing from the toilet to the septic tank. Brandon brought in his plumber and they fixed the problem during the evening hours so that we could have use of the toilet. Greatly appreciated. We would recommend him and we will have him back for future projects.

Upkeep Home Renovation
5.0
from 2 reviews
  • 2 years in business
Jen R.
Verified review

Complete bedroom remodel with epoxy flooring, sheetrock repair, paint, and trim work. I suffer from asthma and wanted the carpet out. Great service with quick results! Very friendly. I would use again!

Houston Home Improvement
3.0
from 2 reviews
  • 9 years in business
  • 2 hires on Thumbtack
Marty M.
Verified review

Ian did very thorough work and his pricing was very fair.

  • 3 years in business
  • 4 hires on Thumbtack
About

We love helping our clients in any project needed.No matter the scope. Or how intricate the task. With over twenty-five years experience. We are highly skilled curtious professionals. That want to satisfy our clients needs. In a timely manor. Keeping material cost down. So our clients can get back to enjoying life. We do new construction work. We even work on building additions. We do remodeling of current space to suite our clients' needs.

N Of A Construction

New To Thumbtack

    About

    We work the remodeling of houses and bathrooms. We are experts in electrical services in both residential and commercial, also experienced in industrial. Or if you just need some good handyman work done around the house, we can get it done!

    Q & A

    Answers to commonly asked questions from the experts on Thumbtack.

    How do I plan a bathroom remodeling project?

    If you’re stumped on how to plan a bathroom remodeling project, it pays to hire a designer. This is especially important if you’re changing your bathroom layout in any way. Designers create contractor-friendly drawings indicating exactly where each tile and fixture will be installed, down to the light switches. This investment might cost you $300-$500 but save you significant frustration and miscommunication, while ensuring you get precisely what you want.

    If you’re going to do your own design, planning a bathroom remodeling project means being organized and planning ahead. Create a general outline of what you want and the budget you have. Identify the specific fixtures, tiles, paint and vanity you prefer. Get all this organized before requesting quotes from two to three reputable general contractors. Once you find the right pro, get a written contract outlining scope of work, materials that will be used, timeframe and payment schedule. Communicate clearly about when to order your materials so they are ready and waiting by the time the contractor gets the permits. Your job from here is to communicate clearly, pay the contractor as the work progresses, and enjoy your remodel when it’s done.

    For more on where to start when remodeling a bathroom check out The Complete Thumbtack Bathroom Remodel Guide.

    Where should I start when remodeling a bathroom?

    Bathroom remodeling doesn’t have to be overwhelming. Before starting a bathroom remodel it’s crucial to know what you want and have a clear understanding of your maximum budget. If you’d love all marble fixtures but have $3,000 total, you will have to compromise. Being realistic about materials and money before you even contact a contractor will have you on the road to success. Here are some simple steps to follow in the planning stages of bathroom remodeling:

    • List your remodeling priorities in order of importance (e.g., 1. New shower head, 2. Replace flooring, 3. Install recessed lighting, etc.).
    • Calculate what you can realistically afford to spend on your bathroom remodel. Identify an “all in” price — meaning the absolute maximum you’re willing to pay, as well as what you’d prefer to spend.
    • Gather ideas from Pinterest about colors and finishes.
    • Research the costs of the materials and finishes you want and begin making choices about what is and isn’t possible to fit into your budget (once labor is included). If you’d like to stay under $10,000 total, but really love a $2,000 tub, plan to downgrade in other areas.
    • Request quotes from at least three reputable general contractors, share your vision and ideal materials, and work together from there.

    How long should a bathroom remodel take?

    With proper planning and a good general contractor, your bathroom remodeling project doesn’t have to take forever. The construction phase of the project will always vary based on your scope of work, the square footage and the condition of your bathroom under the surface layer. Inevitably an 80-square-foot master bathroom with major changes will take longer than a 25-square-foot guest bath undergoing a minor renovation. For a smaller bathroom, a facelift — the industry term for sprucing up the surface layer (such as paint, vanity, tiles or light fixtures) but keeping the existing footprint of the space — may take five to eight working days, as long as there are no surprises like mold waiting when the old vanity comes out. A more complex bathroom remodel that revamps the shower area (customizing the plumbing, installing tile and changing the shower door), updates the flooring and cabinetry, and adds new paint and new lighting could take anywhere from one week to three weeks. A full bathroom remodel that guts the room, changing the footprint and moving the electrical wiring and plumbing lines, could take four to eight weeks or more. To keep your bathroom remodel on schedule, have your materials ordered and waiting, and don’t make any change orders once construction begins. Planning is key to keeping a bathroom remodel on schedule.   

    For more on how long a bathroom remodel should take check out The Complete Thumbtack Bathroom Remodel Guide.

    How do I remodel my bathroom?

    Bathroom remodeling is made up of three general phases. The first phase is the planning and permitting phase, in which you determine exactly what you want, what materials and finishes will be used, and what the end product will look like. If you’re competent with design you can handle the planning yourself, or you may hire an interior designer to guide you. During this phase you’ll also hire a general contractor who can help execute your remodel vision, coordinating and overseeing all the subcontractors required to do the bathroom remodeling (plumbers, flooring pros, etc.). When your plan is finalized, your contractor should obtain permits for the work you want done. During this time you’ll work together to order all the materials so they’ll be ready and waiting when it’s time to start construction.

    The second phase is construction. Bathroom remodeling typically starts with demolition, removing the old floors, shower and vanity to make way for the new. Delays in delivery of materials, or changing your mind and ordering different materials halfway into the project, will mean that construction has to pause until the new materials arrive. Each subcontractor is dependent on the next to do their work, and the general contractor should keep things moving along at the proper timeline, ensuring that the right materials are available and dealing promptly with any unexpected repairs, such as damage discovered behind the walls or under the floor. The general contractor will also coordinate inspections from the necessary officials if you’ve moved load-bearing walls or done electrical or plumbing work. After construction is complete, the final phase of bathroom remodeling is addressing your punch list. These are all the items that need to be corrected before final payment is handed over to the contractor.

    For more on how to remodel a bathroom check out The Complete Thumbtack Bathroom Remodel Guide.

    How much does it cost to remodel a bathroom?

    Nationally, the average cost of bathroom remodeling is $14,000. Bathroom remodels can vary widely, from standard makeovers to luxurious master bathroom revamps. The factors that affect your bathroom remodeling cost are the finishes you choose (marble tiles can cost 20 times as much as standard subway tiles), the square footage of the project, regional labor rates in your area and the scope of work. Changing the layout or size of the bathroom will also raise costs. Moving electrical wiring and plumbing lines will also dramatically increase costs, as you’ll need to hire plumbers and electricians to handle the work. What’s happening behind your walls and under your floor will also affect bathroom remodeling cost: Rot, damage or mold can lead to additional work and charges. Overall, bathroom remodeling may offer great return on investment and also improve your daily life. Here are some examples of average bathroom remodeling costs:

    • 6-foot by 6-foot bathroom remodel: $3,500, including labor and materials.
    • Standard renovation: $6,500-$10,000. Price includes labor and materials the customer has purchased. Labor may include taking out the shower and shower pan, installing new shower pan and shower, and installing new door, new vanity, new mirror, new bathroom fan, and all new fixtures.
      • Price variation depends on the quality of the finishes.
    • 10-foot by 6-foot bathroom remodel: $7,200, including labor and materials.
    • Mid-range renovation: $12,000-$15,000. Price includes labor and materials the customer has purchased.
    • Upscale renovation: $35,000 and up. Price includes labor and materials. Items might include digital displays for fixtures, multiple shower heads and custom showers.

    For more on how to remodel a bathroom, what it costs to remodel a bathroom, what bathroom brands to consider and more check out The Complete Thumbtack Bathroom Remodel Guide.

    Hire skilled professionals for absolutely everything.