Birmingham, AL208 Bath Remodelers near you

Where do you need the bath remodeler?

Answer a few questions

Tell us what you need so we can bring you the right pros.

Get quotes

Receive quotes from pros who meet your needs.

Hire the right pro

Compare quotes, message pros, and hire when ready.

Birmingham Bath Remodelers

Browse these bath remodelers with great ratings from Thumbtack customers in Birmingham.

  • 32 years in business
  • 16 hires on Thumbtack
Sherrie P.
Verified review

Because of the high and vaulted ceilings in my home, I knew it would be a chore to tackle painting my master bath! Mark arrived 20 minutes early, got set up, and finished the job in a short period of time. Mark is very detail-oriented and offers you the best final product. He is polite, friendly, as well as professional, and gave us a very reasonable quote for the work requested. Mark was quick to clean up afterwards and left my husband and I with a great looking room. We would certainly call on Mark for future painting jobs and highly recommend him for any painting needs.

kc services
4.9
from 20 reviews
  • 12 years in business
  • 28 hires on Thumbtack
Heather H.
Verified review

I think he did a wonderful job on cleaning my gutters and he was very responsive each time I texted him.

  • 18 years in business
  • 7 hires on Thumbtack
Thumbtack Customer
Verified review

Shannon cleaned our gutters and nailed them tight. He didn't leave a mess, and discussed their condition, made some minor repairs to the seams, and kept to his quote.

  • 2 years in business
  • 4 hires on Thumbtack
James F.
Verified review

Kevin fox did an excellent job remodeling my bathroom he was very professional always on time an does fantastic work if i ever remodele again i will call him first

Handymen R Us
4.2
from 5 reviews
  • 1 year in business
  • 8 hires on Thumbtack
Dean G.
Verified review

Worked on our home remodel and painting interior of our hose. Professionalism and attention to detail were top notch.

Integrity Remodeling
5.0
from 4 reviews
  • 22 years in business
  • 2 hires on Thumbtack
Mitchell H.
Verified review

Steve has helped me remodel a bathroom, fix a roof, wiring issues, and viewing potential homes to purchase. Always answers his phone or calls back quickly.

Jarrell Remodeling
5.0
from 4 reviews
  • 8 years in business
  • 3 hires on Thumbtack
Ryder A.
Verified review

He explained everything in detail and came up with different options so my bathroom remodel could get done with everything I wanted but was able to save me around $300 in the end. I am very happy with my bathroom and plan to hire him again for my next project.

  • 18 years in business
  • 5 hires on Thumbtack
Charles S.
Verified review

On time for quote, started work the same day for roofing repairs. Fair price and cleaned up after themselves, no nails or scraps. Will see if it leaks soon, but it looks good so far

  • 6 years in business
Tom M.
Verified review

Owner of company arrived on time to inspect job site. He provided several options and prices for building a new deck. Work was started on time and completed in a reasonable amount of time. Owner was on the job site every day they were able to work. I would recommend this company. My deck turned out great.

  • 12 years in business
  • 4 hires on Thumbtack
Joel L.
Verified review

Installed kitchen backsplash using small glass tiles we picked out ahead of time. Very good work, fair price, completed ahead of schedule, left everything clean and tidy. Definitely happy!!

T & A Home Improvements
4.0
from 2 reviews
    TEKISHA K.
    Verified review

    I had a great experience with T&A Home Improvement. I needed my bathroom remodeled and the young man was very professional. He designed it and made it look wonderful. I was very pleased.

    • 18 years in business
    • 2 hires on Thumbtack
    Taylor M.
    Verified review

    Great experience!! Did a wonderful job, will use again.

    • 1 hire on Thumbtack
    Cathy M.
    Verified review

    I have two properties for which I have used Sarah Catherine Design. My 5000 square foot home in Kennesaw, Georgia and my 3 bedroom log cabin/hunting lodge in Alabama. In both spaces, Sarah Catherine has made spot on changes to the spatial layout, bringing in current decorating ideas to enhance my treasured belongings. She was a God send in helping with colors, window treatments, and lighting fixtures for my remodeling. Her approach to hearing what I wanted and making it happen put me at ease and made my husband get on board too! There is so much more to do and I will definitely be working with Sarah Catherine Design from here on out.

    • 2 hires on Thumbtack
    Tack B.
    Verified review

    Bathroom remodel. Tile, paint, Sheetrock , crown molding, installed glass shower enclosure, plumbing Workers were very knowledgeable in all aspects of job. Very polite and courteous to my wife and I.

    • 20 years in business
    Steven B.
    Verified review

    Had PHI complete custom deck and pergola for us. The guys were clean cut and took great pride in not only making use happy with progress and completion of project but were great with our 4 dogs running around them all time. We plan on using them again in spring for bathroom remodel.

    About

    Hiring Sharp Remodeling Specialty gives you over 30 years of experience in the industry. We are state licensed remodelers and state licensed general contractors. We are skilled master craftsmen and experienced in every aspects of designing, building and remodeling your home.

    About

    We have been in business since 1995. We offer a magnitude of services from roofing, waterproofing, drainage work, tree service, kitchen remodeling, windows and door work, siding, driveway and sidewalk concreting and deck and patio work. We offer free estimates, and we are competitively priced in Alabama.

    About

    We do it all. We do the following: * Remodeling * Demolition * Sheetrock hanging and finishing * Painting * Tiling * Framing * Drywall repair * Cabinet, countertop and new vanity installation * Texture molding * Roof repair and more

    About

    We provide a full line of construction services and serve the Over the Mountain Communities, Northern Shelby County, Eastern Jefferson and St. Clair with exceptional service from design to project management to completion. We are one of the few full service companies to provide assistance with maintenance because we know that when we serve you well with a small project, you will think of us for your larger kitchen, bath, addition or remodel projects. We also have an entire division dedicated to roofing, the most important protector of your home. We have master roof installer credentials.

    About

    We remodel homes and do roofing and handyman work. We are hardworking and friendly people you can trust to get the job done that you would love.

    About

    We focus on detail, and make sure our customers are always happy!

    Q & A

    Answers to commonly asked questions from the experts on Thumbtack.

    What is a general contractor?

    When starting a home remodel or new construction project, you will probably hire a general contractor. A general contractor is a professional who is qualified to take a set of building plans and construct them as outlined. The general contractor may help perform the day-to-day building, or they may just hire workers and oversee all the work activities. In either case, the job of the general contractor is to see that your project gets built.

    When you have a building project, ask for bids from various contractors. The bids tell you how much each will charge and what their scope of work will be. Once you have selected a bid, you sign a contract with that general contractor outlining the specifics of the project and the milestones during the project when they will receive payment installments. Once the contract is official, the general contractor will bring in their crew to begin construction. The contractor will manage the workers and subcontractors (anyone who doesn’t work directly for their company but that they need to outsource, like a marble installation pro), order all the materials, obtain work permits, and confirm that all the workers and subcontractors are completing their projects as planned. They typically handle all the payments to the workers and subcontractors, and send you invoice. For all these reasons, it’s also especially important to follow a few smart hiring practices when it comes to finding a general contractor.  If you are organized and competent to oversee construction projects, and are able to make sure everything is being built properly and meeting code, it’s possible you can be your own general contractor.  

    How do I plan a bathroom remodeling project?

    If you’re stumped on how to plan a bathroom remodeling project, it pays to hire a designer. This is especially important if you’re changing your bathroom layout in any way. Designers create contractor-friendly drawings indicating exactly where each tile and fixture will be installed, down to the light switches. This investment might cost you $300-$500 but save you significant frustration and miscommunication, while ensuring you get precisely what you want.

    If you’re going to do your own design, planning a bathroom remodeling project means being organized and planning ahead. Create a general outline of what you want and the budget you have. Identify the specific fixtures, tiles, paint and vanity you prefer. Get all this organized before requesting quotes from two to three reputable general contractors. Once you find the right pro, get a written contract outlining scope of work, materials that will be used, timeframe and payment schedule. Communicate clearly about when to order your materials so they are ready and waiting by the time the contractor gets the permits. Your job from here is to communicate clearly, pay the contractor as the work progresses, and enjoy your remodel when it’s done.

    For more on where to start when remodeling a bathroom check out The Complete Thumbtack Bathroom Remodel Guide.

    Where should I start when remodeling a bathroom?

    Bathroom remodeling doesn’t have to be overwhelming. Before starting a bathroom remodel it’s crucial to know what you want and have a clear understanding of your maximum budget. If you’d love all marble fixtures but have $3,000 total, you will have to compromise. Being realistic about materials and money before you even contact a contractor will have you on the road to success. Here are some simple steps to follow in the planning stages of bathroom remodeling:

    • List your remodeling priorities in order of importance (e.g., 1. New shower head, 2. Replace flooring, 3. Install recessed lighting, etc.).
    • Calculate what you can realistically afford to spend on your bathroom remodel. Identify an “all in” price — meaning the absolute maximum you’re willing to pay, as well as what you’d prefer to spend.
    • Gather ideas from Pinterest about colors and finishes.
    • Research the costs of the materials and finishes you want and begin making choices about what is and isn’t possible to fit into your budget (once labor is included). If you’d like to stay under $10,000 total, but really love a $2,000 tub, plan to downgrade in other areas.
    • Request quotes from at least three reputable general contractors, share your vision and ideal materials, and work together from there.

    How long should a bathroom remodel take?

    With proper planning and a good general contractor, your bathroom remodeling project doesn’t have to take forever. The construction phase of the project will always vary based on your scope of work, the square footage and the condition of your bathroom under the surface layer. Inevitably an 80-square-foot master bathroom with major changes will take longer than a 25-square-foot guest bath undergoing a minor renovation. For a smaller bathroom, a facelift — the industry term for sprucing up the surface layer (such as paint, vanity, tiles or light fixtures) but keeping the existing footprint of the space — may take five to eight working days, as long as there are no surprises like mold waiting when the old vanity comes out. A more complex bathroom remodel that revamps the shower area (customizing the plumbing, installing tile and changing the shower door), updates the flooring and cabinetry, and adds new paint and new lighting could take anywhere from one week to three weeks. A full bathroom remodel that guts the room, changing the footprint and moving the electrical wiring and plumbing lines, could take four to eight weeks or more. To keep your bathroom remodel on schedule, have your materials ordered and waiting, and don’t make any change orders once construction begins. Planning is key to keeping a bathroom remodel on schedule.   

    For more on how long a bathroom remodel should take check out The Complete Thumbtack Bathroom Remodel Guide.

    How do I remodel my bathroom?

    Bathroom remodeling is made up of three general phases. The first phase is the planning and permitting phase, in which you determine exactly what you want, what materials and finishes will be used, and what the end product will look like. If you’re competent with design you can handle the planning yourself, or you may hire an interior designer to guide you. During this phase you’ll also hire a general contractor who can help execute your remodel vision, coordinating and overseeing all the subcontractors required to do the bathroom remodeling (plumbers, flooring pros, etc.). When your plan is finalized, your contractor should obtain permits for the work you want done. During this time you’ll work together to order all the materials so they’ll be ready and waiting when it’s time to start construction.

    The second phase is construction. Bathroom remodeling typically starts with demolition, removing the old floors, shower and vanity to make way for the new. Delays in delivery of materials, or changing your mind and ordering different materials halfway into the project, will mean that construction has to pause until the new materials arrive. Each subcontractor is dependent on the next to do their work, and the general contractor should keep things moving along at the proper timeline, ensuring that the right materials are available and dealing promptly with any unexpected repairs, such as damage discovered behind the walls or under the floor. The general contractor will also coordinate inspections from the necessary officials if you’ve moved load-bearing walls or done electrical or plumbing work. After construction is complete, the final phase of bathroom remodeling is addressing your punch list. These are all the items that need to be corrected before final payment is handed over to the contractor.

    For more on how to remodel a bathroom check out The Complete Thumbtack Bathroom Remodel Guide.

    Hire skilled professionals for absolutely everything.