How long should a bathroom remodel take?

Thumbtack Editors
Answered

With proper planning and a good general contractor, your bathroom remodeling project doesn’t have to take forever. The construction phase of the project will always vary based on your scope of work, the square footage and the condition of your bathroom under the surface layer. Inevitably an 80-square-foot master bathroom with major changes will take longer than a 25-square-foot guest bath undergoing a minor renovation. For a smaller bathroom, a facelift — the industry term for sprucing up the surface layer (such as paint, vanity, tiles or light fixtures) but keeping the existing footprint of the space — may take five to eight working days, as long as there are no surprises like mold waiting when the old vanity comes out. A more complex bathroom remodel that revamps the shower area (customizing the plumbing, installing tile and changing the shower door), updates the flooring and cabinetry, and adds new paint and new lighting could take anywhere from one week to three weeks. A full bathroom remodel that guts the room, changing the footprint and moving the electrical wiring and plumbing lines, could take four to eight weeks or more. To keep your bathroom remodel on schedule, have your materials ordered and waiting, and don’t make any change orders once construction begins. Planning is key to keeping a bathroom remodel on schedule.   

For more on how long a bathroom remodel should take check out The Complete Thumbtack Bathroom Remodel Guide.

Ready to hire a Bathroom Remodel Contractor?

You never pay to use Thumbtack: Get cost estimates, contact pros, and even book the job—all for no cost.